Make Sure It Fits Your Space
Measure Twice
Check Connections
Professional Install
Essential Measurements
• Opening width: Measure the exact width of the space
• Add clearance: Allow 1/4" to 1/2" on each side for most appliances
• Cabinet width: For built-in units, measure interior cabinet dimensions
• Door clearance: Ensure appliance doors can fully open
Height Measurements
• Floor to ceiling: Measure total available height
• Cabinet height: Interior height for built-in appliances
• Countertop height: Standard is 36", but verify
• Overhead clearance: Check for range hoods, cabinets
Depth Considerations
Refrigerators
• 1" clearance on sides
• 1" clearance on top
• French door swing space
• Water line access
Ranges/Cooktops
• 30" min clearance above
• Side clearances to cabinets
• Gas line positioning
• Electrical outlet location
Dishwashers
• Standard 24" wide opening
• 34" height clearance
• Plumbing access underneath
• Electrical connection nearby
Required Connections & Utilities
Electrical Requirements
• 115V/20A for most small appliances
• GFCI protection in wet areas
• Dedicated circuit recommended
High-Power Appliances
• 240V for electric ranges/dryers
• 30-50 amp service required
• Professional installation needed
Plumbing Connections
• Hot and cold water lines
• Shut-off valves accessible
• Proper water pressure (20-120 PSI)
Drainage
• Drain line with proper slope
• Air gap for dishwashers
• Garbage disposal compatibility
Gas Connections
• Proper gas line sizing
• Shut-off valve within 6 feet
• Professional installation required
Propane (LP)
• Conversion kit may be needed
• Tank location considerations
• Local code compliance
Safety Requirements
Electrical Safety
Gas Safety
Space Preparation
Before Installation
• Clear the path: Remove obstacles from delivery route
• Protect floors: Use cardboard or moving blankets
• Remove old appliance: Disconnect and remove safely
• Clean the space: Vacuum and wipe down area
• Check utilities: Test all connections
Installation Day
• Be present: Available for questions and access
• Clear workspace: Give installers room to work
• Have tools ready: Basic tools may be needed
• Test everything: Verify all functions work
• Ask questions: Get operating instructions
Columbus Area Considerations
• Basement access for utilities common
• Local code requirements vary by suburb
• Seasonal delivery scheduling recommended
Common Installation Issues
• Cabinet modifications needed
• Electrical panel upgrades required
• Plumbing relocations necessary
Pre-Purchase Checklist
Measurements
Need Professional Help?
Free Services Include:
• Measurement verification
• Utility requirements assessment
• Delivery scheduling
Professional Installation:
• Electrical and plumbing connections
• Old appliance removal and disposal
• Full testing and warranty
